Abstract
The chapter examines the potential for improvements to the efficiency of the architectural design process arising from the use of concurrent engineering management tools and sets out an analysis of how the contractual relationship of the parties may assist or militate against this in various procurement arrangements in the UK construction industry
Original language | English |
---|---|
Title of host publication | Concurrent Engineering in Construction: ed Anumba, C; Cutting-Decelle, A S; and Kamara, J |
Place of Publication | London |
Publisher | Mill Press |
Pages | 87-99 |
ISBN (Print) | 9 7804 1539 488 8 |
Publication status | Published (in print/issue) - 2006 |