An Assessment of the Accuracy of Quantity Surveyors' Preliminary Cost Estimates in Nigeria

H Odeyinka, A.A. Oladapo

    Research output: Contribution to journalArticle

    LanguageEnglish
    Pages33-38
    JournalJournal of Construction Engineering
    Volume18
    Issue number1
    Publication statusPublished - Jan 2003

    Cite this

    @article{4b35dd4e97834584a5fc8a6436273687,
    title = "An Assessment of the Accuracy of Quantity Surveyors' Preliminary Cost Estimates in Nigeria",
    author = "H Odeyinka and A.A. Oladapo",
    note = "Hard Copy deposited at BERI office",
    year = "2003",
    month = "1",
    language = "English",
    volume = "18",
    pages = "33--38",
    journal = "Journal of Construction Engineering",
    issn = "2356-7295",
    number = "1",

    }

    An Assessment of the Accuracy of Quantity Surveyors' Preliminary Cost Estimates in Nigeria. / Odeyinka, H; Oladapo, A.A.

    In: Journal of Construction Engineering, Vol. 18, No. 1, 01.2003, p. 33-38.

    Research output: Contribution to journalArticle

    TY - JOUR

    T1 - An Assessment of the Accuracy of Quantity Surveyors' Preliminary Cost Estimates in Nigeria

    AU - Odeyinka, H

    AU - Oladapo, A.A.

    N1 - Hard Copy deposited at BERI office

    PY - 2003/1

    Y1 - 2003/1

    M3 - Article

    VL - 18

    SP - 33

    EP - 38

    JO - Journal of Construction Engineering

    T2 - Journal of Construction Engineering

    JF - Journal of Construction Engineering

    SN - 2356-7295

    IS - 1

    ER -