Abstract

A need-based integrated performance monitoring strategy is proposed to economize the operation of a thermal power plant, exploiting the immensely powerful resources of newly retrofitted modern Distributed Control System (DCS). After reviewing the performance monitoring practice of a typical 200 MW oil/gas fired thermal power plant at Ballylumford, N. Ireland, the paper analyses its shortcomings and then suggests remedial measures through the proposed strategy. A simulation of this plant has beenused for investigation purposes. The twin key aspects of performance monitoring, i.e. monitoring of performance indices and controllable parameters, are addressed in more effective and novel ways. The achievable best efficiency values of plant components, needed for comparative performance evaluation, are shown to be more reliably and accurately obtainable through neural network performance models. A method based on histogram plots is shown to be highly effective in monitoring the performance of plant controllers in reducing the variability of plant variables and then modifying the set-points to improve the thermal performance of the plant.
LanguageEnglish
Pages802-809
JournalIEEE Transactions on Energy Conversion
Volume14
Issue number3
Publication statusPublished - Sep 1999

Fingerprint

Power plants
Monitoring
Distributed parameter control systems
Gas oils
Network performance
Hot Temperature
Neural networks
Controllers

Cite this

Prasad, G ; Swidenbank, E ; Hogg, B W. / A Novel Performance Monitoring Strategy for Economical Thermal Power Plant Operation. 1999 ; Vol. 14, No. 3. pp. 802-809.
@article{11ed4246e81a46d496ebd793d033f8de,
title = "A Novel Performance Monitoring Strategy for Economical Thermal Power Plant Operation",
abstract = "A need-based integrated performance monitoring strategy is proposed to economize the operation of a thermal power plant, exploiting the immensely powerful resources of newly retrofitted modern Distributed Control System (DCS). After reviewing the performance monitoring practice of a typical 200 MW oil/gas fired thermal power plant at Ballylumford, N. Ireland, the paper analyses its shortcomings and then suggests remedial measures through the proposed strategy. A simulation of this plant has beenused for investigation purposes. The twin key aspects of performance monitoring, i.e. monitoring of performance indices and controllable parameters, are addressed in more effective and novel ways. The achievable best efficiency values of plant components, needed for comparative performance evaluation, are shown to be more reliably and accurately obtainable through neural network performance models. A method based on histogram plots is shown to be highly effective in monitoring the performance of plant controllers in reducing the variability of plant variables and then modifying the set-points to improve the thermal performance of the plant.",
author = "G Prasad and E Swidenbank and Hogg, {B W}",
year = "1999",
month = "9",
language = "English",
volume = "14",
pages = "802--809",
number = "3",

}

Prasad, G, Swidenbank, E & Hogg, BW 1999, 'A Novel Performance Monitoring Strategy for Economical Thermal Power Plant Operation', vol. 14, no. 3, pp. 802-809.

A Novel Performance Monitoring Strategy for Economical Thermal Power Plant Operation. / Prasad, G; Swidenbank, E; Hogg, B W.

Vol. 14, No. 3, 09.1999, p. 802-809.

Research output: Contribution to journalArticle

TY - JOUR

T1 - A Novel Performance Monitoring Strategy for Economical Thermal Power Plant Operation

AU - Prasad, G

AU - Swidenbank, E

AU - Hogg, B W

PY - 1999/9

Y1 - 1999/9

N2 - A need-based integrated performance monitoring strategy is proposed to economize the operation of a thermal power plant, exploiting the immensely powerful resources of newly retrofitted modern Distributed Control System (DCS). After reviewing the performance monitoring practice of a typical 200 MW oil/gas fired thermal power plant at Ballylumford, N. Ireland, the paper analyses its shortcomings and then suggests remedial measures through the proposed strategy. A simulation of this plant has beenused for investigation purposes. The twin key aspects of performance monitoring, i.e. monitoring of performance indices and controllable parameters, are addressed in more effective and novel ways. The achievable best efficiency values of plant components, needed for comparative performance evaluation, are shown to be more reliably and accurately obtainable through neural network performance models. A method based on histogram plots is shown to be highly effective in monitoring the performance of plant controllers in reducing the variability of plant variables and then modifying the set-points to improve the thermal performance of the plant.

AB - A need-based integrated performance monitoring strategy is proposed to economize the operation of a thermal power plant, exploiting the immensely powerful resources of newly retrofitted modern Distributed Control System (DCS). After reviewing the performance monitoring practice of a typical 200 MW oil/gas fired thermal power plant at Ballylumford, N. Ireland, the paper analyses its shortcomings and then suggests remedial measures through the proposed strategy. A simulation of this plant has beenused for investigation purposes. The twin key aspects of performance monitoring, i.e. monitoring of performance indices and controllable parameters, are addressed in more effective and novel ways. The achievable best efficiency values of plant components, needed for comparative performance evaluation, are shown to be more reliably and accurately obtainable through neural network performance models. A method based on histogram plots is shown to be highly effective in monitoring the performance of plant controllers in reducing the variability of plant variables and then modifying the set-points to improve the thermal performance of the plant.

M3 - Article

VL - 14

SP - 802

EP - 809

IS - 3

ER -